Since its establishment in 1975, Astraco has successfully delivered hundreds of projects across a wide range of sectors. Our portfolio includes major infrastructure works, such as potable water networks, sewerage systems, and stormwater networks, as well as industrial facilities, commercial buildings, hotels, and residential developments.
Our major prestigious completed projects in this industry is shown below
The scope of covers the procurement and supply of materials, delivery, transportation, handling, storing at site, surveying of the site, detailed design, preparation of technical submittal for materials and equipment, preparation of shop drawings, constructions, erection, installation testing, commissioning, new development/replacement, replacing pipeline and other installation by new provision where necessary. Upgradation of pump stations at 4 locations. New development /replacement of old existing pipeline and associated works LM DI/HDPE pipe line DN 150 to DN 600 including NDRC and associated electrical installation works
Client / Consultant –TAQA, Location – UAE, Year of Completion – Ongoing,
The scope of work consist of repairing or replacement of leaking pipeline in Transco regions, the work comprises any emergency & urgent site inspection and mobilization of manpower, equipment & machinery, material, etc. to repair or to replace a certain defected section of water transmission main pipeline in Transco network / pump stations: suction & Discharge Headers / Piping on emergency basis in coordination with water maintenance engineer.
Client / Consultant –TAQA, Location – UAE, Year of Completion – Ongoing,
The work comprises of the urgent site inspection and mobilization of manpower, equipment, material etc. to repair or to replace a certain defected section of water transmission main / Pump Suction & Discharge Headers/ Piping on emergency basis in coordination with Water Transmission Engineer. The emergency response contract includes the Water Transmission mains in the Abu Dhabi Island, Mainland, Eastern Region, Western Region and Fujairah.
Client / Consultant –TRANSCO, Location – UAE, Year of Completion – 2024,
Engineering, Procurement and Construction of 42.7 K.M. DN 1600 D.I. Pipeline, 4.7 K.M. DN 1400 D.I. Pipeline with 6.8 K.M. 8 branches of DN 400 to DN 1200 from AI Hayer Tanks Compound to Junction A, lP131 Area of AI Ain. & 22.0 KM DN 1600 Ductile Iron Pipeline with 4.0 K.M. five branch lines of DN 800 and DN 1000 from Zakher to Mezyad including Electrical and Scada Control System.
Client / Consultant –TRANSCO /Tebodin Middle East Ltd, Location – Al Ain, Year of Completion – 2020,
Attend the site and assess damage up on receiving information about any defect or incident (leakage or pipeline damage of any anature) with TRANSCO Engineer. Communicate and agree the methods of repair. Acquire all required security passes from other utility owners. Mobilize immediately to site and commence the repairing works
Client / Consultant –TRANSCO, Location – UAE, Year of Completion – 2018,
Construction of 1300 meters DN 1200 carbon steel pipeline interconnection including motor operated valves, check valves, flow control valves, construction of 2000 meters DN 1200 D.I. pipeline including flow control valves, butterfly valves, various connections to existing reservoirs, pumping stations, etc, all associated civil works including electro mechanical works including Scada System, flow meters, modification to existing electrical system, etc.
Client / Consultant –TRANSCO /Tebodin Middle East Ltd, Location – Al Ain, Year of Completion – 2010,
Supply and installation of 121,800 Nos Electronic Consumer Water Meters (Size: 1/2″ to 2″) instead of existing mechanical water meters including complete survey works, supply and installation of Induction Touch Pad, Hand Held Remote Reading Device, Check Valve, Stop Valve, Lockable Brass Valves and various types of pipe fittings.
Client / Consultant –ADDC /Hyder Consulting, Location – Abu Dhabi Region, Year of Completion – 2007,
Installation of 5.1 KM DN 900 mm Ductile Iron Pipeline, construction of chambers, transportation of free supplied pipes & fittings, exhume existing pipes, repair and transport to Client’s store.
Client / Consultant –ADWEA /Penspen International Ltd, Location – Mussafah Abu Dhabi Region, Year of Completion – 2006,
Construction and Commissioning of 122.0 KM DN 1000 Pipelines, from Sweihan to Al Maha Forest and Ajban Farms including connections to existing reservoir inlets and outlets, construction of chambers, thrust blocks and all other associated civil works, electro mechanical works, Scada control system, etc.
Client / Consultant –ADWEA /Montgomery Watson, Location – Ajban Abu Dhabi Region, Year of Completion – 2006,
Supply, installation, testing and commissioning of 36.0 KM DN 1200 Ductile Iron Pipeline from Taweelah to Unit III Pumping Station including
connection and disconnection to the existing DN 1200 and DN 1000 Pipeline, construction of chambers and associated civil works including modification to Scada Software, PLC Control System with related electro mechanical works.
Client / Consultant –ADWEA /Tebodin Middle East Ltd, Location – Tawaleeh Abu Dhabi Region, Year of Completion – 2005,
Water Transmission Network from Seih Gharaba Water Wells to existing water tanks consisting of approx. 28.0 KM of pipeline of DN 500 mm GRP and DN 300 mm Ductile iron pipe, including chambers, well houses, control room building, electro mechanical works, Scada and Control System, deep well pumps, etc.
Client / Consultant –ADWEA /Tebodin Middle East Ltd, Location – Seih Gharaba AI Ain, Year of Completion – 2004,
7.0 KM DN 300-500 mm Ductile Iron Water Distribution Network at AI Jazeera Area including connections to existing tanks and network systems, construction of chambers, formation of embankment, etc.
Client / Consultant – Abu Dhabi Water & Electricity Authority, Location – Ghantoot Abu Dhabi, Year of Completion – 2004,
Water Transmission network from AI Yaif Water Wells to Sh. Mansour Tank, AI Naggi Tank and Al Azab Tank consisting of 63.5 KM of 400 mm dia GRP and OD 450, 315 & 180 HDPE Pipeline from Bida Saif to Sh. Mansour Tank and Backup line from existing DN 100 to 400 Ductile Iron pipe water line, connection to VIP/VVIP at AI Ain Areas including 18 Nos well houses, pumping station, reservoir, accommodation building, external works inside Pumping Station compound with electro mechanical works, Scada Control System, etc.
Client / Consultant – Abu Dhabi Water & Electricity Authority /Tebodin Middle East Ltd., Location – AI Yaif AI Ain, Year of Completion – 2004,
4.0 KM of 500 mm dia Water Supply Scheme, connection of existing 600 mm dia pipeline with all associated chambers, thrust blocks, etc.
Client / Consultant –ADWEA /Tebodin Middle East Ltd., Location – Tawaleeh, Year of Completion – 2003,
17.0 KM of 200mm, 300mm & 600mm Dia Water Supply Scheme including channel crossing to Sh. Saif Island, connection to existing 1000 mm dia pipeline with all associated chambers, thrust blocks, etc
Client / Consultant –ADWEA, Location – Tawaleeh, Year of Completion – 2003,
17.0 KM of 200mm, 300mm & 600mm Dia Water Supply Scheme including channel crossing to Sh. Saif Island, connection to existing 1000 mm dia pipeline with all associated chambers, thrust blocks, etc
Client / Consultant –ADWEA, Location – Tawaleeh, Year of Completion – 2003,
Water Distribution Network at Towayya, Masoudi,Falaj Hazza, Markhania, Al-Oha, Ramlat AI Rae and Al Faqa. 360.0 KM 150-600 mm dia Ductile Iron Pipeline including house connections, NDRC, 0.5 m Gallon Reservoir, pumping station, connection to existing pipelines, electro mechanical works, etc.
Client / Consultant –ADWEA/Tebodin Middle East Ltd., Location – Al Ain, Year of Completion – 2002,
47.0 KM 100-600 mm dia Ductile Iron Pipeline, Valve Chambers, Manholes, NDRC, etc.
Client / Consultant –ADWEA/Mott MacDonald, Location – Al Ain, Year of Completion – 2001,
5.0 KM 100-600 mm dia Ductile Iron Pipeline, Valve Chambers, NDRC, house connections, augmentation and maintenance, etc.
Client / Consultant –ADWEA /D.Balfour & Sons, Location – Al Ain, Year of Completion – 2001,
5.0 KM 200 mm dia Ductile Iron Pipeline, Valve Chambers, connection to existing water tanks, etc.
Client / Consultant –ADWEA, Location – Abu Dhabi, Year of Completion – 1999,
43.35 KM 100mm – 800mm dia Ductile Iron Pipeline, Reservoir, Augmention & Maintenance Works and House Connections.
Client / Consultant –ADWEA/D.Balfour & Sons, Location – Al Ain, Year of Completion – 1999,
Supply and Construction of 300 mm Dia 6.0 KM Supply Line for New Jurf Palace
Client / Consultant –WED, Location – Abu Dhabi, Year of Completion – 1999,
Installation of Ductile Iron Pipes, Fittings & Valves, 1000 mm Dia 28.5 KM, 500mm Dia 5.7 KM, 4 Nos NDRC, gatch protection bond, valve chambers, including all associated works.
Client / Consultant –WED/Tebodin Middle East Ltd, Location – Tawaleeh, Year of Completion – 1998,
Construction of 77.3 KM 300mm to 1200mm dia Ductile Iron Water Supply Pipeline, 2m to 15m deep, valve chambers, 1500 metres NDRC at AI Ain, Hilli, Markhania, Khabisi Areas
Client / Consultant –WED/D.Balfour & Sons, Location – Al Ain, Year of Completion – 1998,
Construction of 41.0 KM 500mm Dia Water Supply Pipeline, 1 No. 1 Million Imp. Gallon Concrete Tanks, 2 Nos Pumping Station and Electro Mechanical Works at Feeli / Shuwaib Area
Client / Consultant – Al Ain Municipality Garden Section /D.Balfour & Sons, Location – Al Am, Year of Completion – 1994,
4 Nos 54,809 Gallon Bolted Steel Tanks, 4 Nos 36,600 Gallon Bolted Steel Tanks including foundation, 15.0 K.M 150 mm dia and 4.0 KM 200mm dia ductile iron pipelines, 114 Valve
Chambers, Filtration Plant Pump House, Operators
House, Cold Store, 14 Well Head Shelters including all electro mechanical and instrumentation works which includes Booster pumps, filters, overhead transmission line and all associated civil works including 26,000 m2 of earth work, levelling/grading/compaction.
Client / Consultant – UAE Armed Forces /Engineering Corps, Location – Sweihan, Year of Completion – 1987,
Supply and Construction of 14.0 K.M Ductile Iron Pipeline with all accessories, 10,000 Cu.m Earth Moving.
Client / Consultant – UAE Armed Forces /Engineering Corps, Location – Sweihan, Year of Completion – 1982,
35.0 K.M. 600 mm D.I. Pipeline, 500,000 Cu.m earth moving, 8 wells complete with well field installations, Generator House, Pumping Station, 3 Nos 1/4 MillionGallon Water Tanks, 3 Nos 500,000 Gallon Tanks, Foundations, Pressure Filters, Electrical and instrumentation Works
Client / Consultant – UAE Armed Forces /Engineering Corps, Location – Sweihan, Year of Completion – 1982,
2 Nos 1/2 Million Gallon steel Tanks and
Foundations, 90.0 K.M of Ductile Iron Pipelines, 24″ & 20″ 90 K.M access roads, 2,000,000 Cu.m of earth works, R.C. Manholes, Valves, Fittings, Road Crossings, Pumping Stations, Booster Pumps, Electrical and Instrumentation Works.
Client / Consultant – UAE Armed Forces /Engineering Corps, Location – Sweihan, Year of Completion – 1981,
8 Nos 1 Million Gallon steel Tanks and Foundations, 11.0 K.M of Ductile Iron Pipelines, 24″ & 20″ 110.0 K.M access roads, 10 metres wide 2,500,000 Cu.m of Earth Moving, R.C. Manholes, Valves, Fittings, Road Crossin9s, Distribution Networks including connection to various camps, water filling station, etc
Client / Consultant – UAE Armed Forces /Engineering Corps, Location – Sweihan, Year of Completion – 1982,