Since its establishment in 1975, Astraco has successfully delivered hundreds of projects across a wide range of sectors. Our portfolio includes major infrastructure works, such as potable water networks, sewerage systems, and stormwater networks, as well as industrial facilities, commercial buildings, hotels, and residential developments.
Our major prestigious completed projects in this industry is shown below
Construction of 2 story camp building (Total area 1800 Sq. m) for employees offices, stores , gate house and other associated works in Al Ain
Client / Consultant –Astraco Construction, Location – AI Ain, Year of Completion – 2014,
The scope consists of civil & Infrastructure works
involving the following:
1 Earthworks involving 3,542,180 m3
2 Road Works involving 242,880 m2 of asphaltic
concrete
3 Potable Water Network involving 26,610 m length of HDPE pipe dia ranging from 60mm to 315mm 4 Sewer Network involving 32,750m length of uPVC pipe with dia ranging from 150mm to 250mm,
Irrigation Network involving 24,150m length of HDPE with dia. ranging from 110 to 280mm OD
Electrical Power Distribution Systems consisting of 42 Nos. 11/.415 kV Substations including switchgears, transformers and street lighting Works
7 Pumping stations, and all associated works etc.
Client / Consultant –Urban Development Committee / Parsons International Ltd., Location – Gayathi, Year of Completion – 2010,
Construction of Six Villas each, having an area of
570 m2 per each villa with all modern amenities. Each villa consists of ground floor, first floor and roof.
Client / Consultant –Rashed Sultan Al Dhahiri /Namahi Engineering Consultancy, Location – Abu Dhabi, Year of Completion – 2007,
Luxurious Hotel at AI Marfa with Swimming Pool and all modern amenities including all electro mechanical works, Stained Glass Domes, Panoramic Elevators, etc.
Client / Consultant –Public Works Department /AI Salaam Consultant, Location – Marfa, Year of Completion – 2001,
Construction of Parking with Pasco Paving, Upstand Kerbs and Associated worth’s
Client / Consultant – Abu Dhabi Municipality, Location – AI Ain, Year of Completion – 1994,
Construction of New Majless including piling, marble works at the close proximity of existing villa
Client / Consultant –Management of H.H. Sh. Sultan Bin Zayed AI Nahyan/ Gazi awad, Location – Abu Dhabi, Year of Completion – 1996,
Construction of New Villas and Demolition and Renovation of Existing Villas at H.H. Ruwais Villa
Client / Consultant – H.H. The Crown Prince Private Management A.E.C., Location – Ruwais, Year of Completion – 1994,
Construction of Luxury Double Storey Villa around Swimming Pool including structural steel roof with a 9.0 m Dia Poly Carbonate Dome, Plant Room/Chiller Yard, Car Parking including Air-conditioning, Electrical, Swimming Pool, Filtration System, Plumbing, etc, with top class finishes
Client / Consultant – H.H. The Crown Prince Private Management/ A.E.C., Location – Al Ain, Year of Completion – 1993,
Consisting of the following:
1) H.H. Al Ain Villa:
Luxury Double Storey Villa of 4,000 m2 area with Top Glass finishes including Air-conditioning, Electrical, Plumbing, Landscaping, Foundation, etc.
2) H.H. Al Ain Majlis Modification:
Modification of Existing Majlis including additional rooms, special finishes, Electrical works, Air-conditioning Works, etc.
3) H.H. Al Ain Majlis External Works:
Construction of Boundary Wall, Guards
Accommodation, Family Entrance, Service Entrance, including special finishes such as Jordanian Stone, Glass Mosaic, etc.
4) New Ancillary Buildings and
Modification to Existing:
Construction of Servants Accommodation, Students, Accommodation, Heliport, Kennel/Guard building, etc.
Client / Consultant – H.H. The Crown Prince Private Management/ A.E.C, Location – Al Ain, Year of Completion – 1993,
Construction of testing facilities for Mirage 2000
including convential weapon workshop, super mama and magic missile building, armed missile and laser guided bomb building, battalion building, earth works, asphalt works, air-conditioning, electrical works, etc.
Client / Consultant – UAE Armed Forces/Engineering Corps, Location -Moqatara, Year of Completion – 1987,
Supply and Installation of Booster Pumps, Manifolds, Supply and Installation of Instrumentation System, Chemical Dosing Systems, (Stainless Steel Piping, Hastelloy Piping, Pumps, etc), Overhead Gantry Crane, Ductile Iron Pipelines, Electrical Works, Pumping Station Building, Chemical Store, Laboratory (with furnishing), Chemical Dissolving Building, etc.
Client / Consultant –Water & Electricity Department/ Tebodin Middle East Ltd., Location – Abu Dhabi, Year of Completion – 1986,
25 Storey Twin Tower Building, consisting of Basement Floor, 19 Typical Residential Floors, Terrace, Machine Room, Water Tanks, etc, including all Mechanical, Electrical, Air-conditioning, Piling Works, etc.
Client / Consultant – H.H. Sh. Sultan Din Khalifa Bin Zayed AI Nahyan / A.G.G., Location – Abu Dhabi, Year of Completion – 1984,
Construction of AI Badi Villa Complex with all deluxe finishes, full decoration and furniture, central air- conditioning, access roads, services, etc.
Client / Consultant – Col. Mohammed Al Badi/Sasco, Location – Abu Dhabi, Year of Completion – 1984,
Construction of Luxury Villa with Gypsum Decorative Works, Fountains and Top Glass Finishes
Client / Consultant – H.H. Sheikh Khalifa /A.C.G., Location – Abu Dhabi, Year of Completion – 1982,
400,000 Cu.m Earth Moving, 17,000 Sq.m Roads,
10,000 Sq.m Marble Walkways, 6.000 Sq.m Aggregate Walkways, Water Foundations including complete marble works, wooden pergolas, fiber glass roofed car parking canopies, external sighting system, Maids Quarters, Drivers Quarters, Garage, Ground Water Tanks, Oriental Kitchen, Industrial Gas Storage Building, Cold Storage for Garbage, Sea Front Wall, Aluminum Gates, etc.
Client / Consultant – H.H. Sh. Khalifa bin Zayed Al Nahyan / Amecs, Location – Abu Dhabi, Year of Completion – 1981,
A modern Kindergarten School in fair face concrete and precast elements with elevated water tank, patios, walkways and complete water and drainage system plus access road
Client / Consultant –Public Works Department /Spectrum, Location – Abu Dhabi, Year of Completion – 1980,
7 Storey Residential Building in fair Face Concrete with deluxe finishes
Client / Consultant – Mls Sheika Bint Maadad, Location – Abu Dhabi, Year of Completion – 1980,
11 Storey Residential Building in fair face concrete and brick facing with deluxe finishes and central air- conditioning
Client / Consultant – Mr. Sayyed Taj Ed-Dine ISpectrum Engg., Location – Abu Dhabi, Year of Completion – 1980,
External Works to Al Mushref Palace including Mosque, ancillary Buildings, Roads, Water Distribution System, Drainage and Irrigation
Client / Consultant – Mr. Sayyed Taj Ed-Dine ISpectrum Engg., Location – Abu Dhabi Defense Force, Year of Completion – 1979,
A Complex of 24 Villas including all external services, roads, walkways, water distribution drainage and landscaping.
Client / Consultant – Mr. Mohammed AI Badi, Location – Abu Dhabi Defense Force, Year of Completion – 1979,
A Complex of Two Large Villas, 1200 m2 each, including air-conditioning and decoration, together with Main Majlis, Garages, Maids Quarters, Access Roads, Landscaping and Irrigati0n and F.F. Concrete Fence.
Client / Consultant – M/s Sultan & Abdulla Bin Rashed, Location – Abu Dhabi Defense Force, Year of Completion – 1978,
A 12 Storey Residential Tower Building in precast concrete facades including all services
Client / Consultant – Mr. Ahmed Bandouk AI Quamzi, Location – Abu Dhabi Defense Force, Year of Completion – 1978,
A 12 Storey Residential Office Block with central air-conditioning and all services.
Client / Consultant – Mr. Mohammed Aweida, Location – Abu Dhabi Defense Force, Year of Completion – 1978,
A 10 Storey Residential Building with sophisticated central air-conditioning system and modern services.
Client / Consultant – Mr. Mohammed Al Makhawi, Location – Abu Dhabi Defense Force, Year of Completion – 1978,
Two buildings (One Residential & One Officer, each 10 stories, including central Air-conditioning, Landscaping and Access Roads
Client / Consultant – M/s Sultan & Abdulla Bin Rashed, Location – Abu Dhabi Defense Force, Year of Completion – 1977,