Since its establishment in 1975, Astraco has successfully delivered hundreds of projects across a wide range of sectors. Our portfolio includes major infrastructure works, such as potable water networks, sewerage systems, and stormwater networks, as well as industrial facilities, commercial buildings, hotels, and residential developments.
Our major prestigious completed projects in this industry is shown below
Installation of Permanent Dewatering System to lower the water level, consisting of 11.0 KM PVC gravity / pressure and perforated pipe work, 115 Nos Manholes, 2 Nos Pumping Stations, 1 No. NDRC, etc.
Client / Consultant – ADNOC / Acer/John Taylor, Location – Ruwais, Year of Completion – 1995,
Construction of Foundations for Water Supply Wells and Water Injection Wells, Pipe Supports
Client / Consultant –ADCO /Stone & Webster Engineering Ltd., Location – Habshan, Year of Completion – 1993,
Construction of Ground Water Seepage Network for lowering water level, 150mm dia UPVC perforated pipework, approx. 1,200 meters.
Client / Consultant –ADNOC /John Taylor & Sons, Location -Abu Dhabi, Year of Completion –1990,
Construction of Foundation for the Hydrocracking Planton site (17,000 m3) including excavation, backfill, dewatering, supply and installation of anchor bolts,
Client / Consultant –ADNOC /Snamprogetti, Location – Ruwais, Year of Completion – 1988,
slid plates, insert plates manholes, bund walls, pipe rack foundations, deep sumps, pavements, etc. Fire proofing (1,700m3) of steel structures, underground carbon steel piping (1400 meters) 4″ to 18″ excavation, backfill, testing, supply and installation of cathodic protection accessories.
Construction of Sub-Station/Control Room at Habshan including earth works, gatch works, asphalt works, fencing, etc.
Client / Consultant –ADCO /Fluor/Arec, Location – Habshan, Year of Completion – 1988,
Installation of 1200 mm Dia GRP Pipeline 300 Meters including excavation, dewatering, bedding, back filling, construction of manholes, road crossing, etc.
Client / Consultant –ADNOC /Snamprogetti, Location – Ruwais, Year of Completion – 1985,
Earth works, Cut & Fill, Gatch surface protection, Crude Oil Stabilization, S Nos Control Room Building, S Nos Burn Pits including Refractory Brick Works
Client / Consultant –ADCO /IBI/AREC, Location – Asab, Year of Completion – 1986,
Provide Injection Facilities of Pentane into Product Pipeline, Foundations for Equipment’s, Injection Pipeline, Road Works, Earth Works, Electrical Works, Instrumentation Works,
Client / Consultant –ADNOC /Engineers India Ltd., Location – Ruwais, Year of Completion – 1984,
Design and Construction of Chemical Storage Building (Steel Frames and insulated cladding and roofing), A/C works, Electrical Works including flame proof fittings.
Client / Consultant –ADNOC /Fluor Mideast Ltd., Location -Habshan, Year of Completion – 1984,
Design and Construction Administration Building, Fire Station and Guard Houses complete with concrete Sub-structure, Block work, demountable partitions including installation of Air-conditioning System, Electrical Works, Fire Alarm System and Plumbing/drainage Works, Construction of Water Treatment Building (Steel Frame Work and Insulated Cladding and Roofing) including noise control partitions
Client / Consultant –ADNOC /Fluor Mideast Ltd., Location -Habshan, Year of Completion – 1984,
Foundations for construction camp, permanent camp, social center buildings including swimming pool, games room, kitchen dining room, complete with electrical and A/C system, design and construction of sewage system, complete package including sewage treatment plant, sludge drying beds, incinerator, lifting stations, sewage pipelines, connections to the modular buildings, potable water system complete package including bolts steel storage tanks, pumps, pumping station, distribution network, design and construction of fire water system complete including bolted steel storage tanks, pumps, pumping station, distribution network, pipe hydrants, monitors, construction of walkways, outdoor game facilities, etc, earth works for complete sewage potable water, fire water system, concrete pavements, etc.
Client / Consultant –ADNOC /Fluor Mideast Ltd., Location – Habshan, Year of Completion – 1983,
Construction of foundations for complete gas treating plant (approx. 5,000 m3) including deep sumps, culverts, bund walls, chambers, pipe rack foundations (main pipe racks, gas treating pipe racks, sulphur recovery pipe racks, utilities pipe racks) liquid retaining structures, surge drums, boiler foundations, equipment foundations, road crossing ducts, fire proofing of steel pipe racks, concrete block work, acid resistant brick work, underground GRP and VC pipework (approx. 15,000 m) including excavation, laying, testing, installation of fire hydrants, monitors, installation of pipe racks (2500 Tons), etc.
Client / Consultant –ADNOC /Fluor Mideast Ltd., Location – Habshan, Year of Completion – 1983,
Construction of 2nd Street Culvert, Demolition of Existing Culvert and Construction of New Culvert and Retaining Walls over existing Gas Pipeline including excavation, backfilling, construction of embankments
Client / Consultant –ADNOC /Fluor Mideast Ltd., Location – Das Island, Year of Completion – 1982,
Excavation of Trenches, Backfilling, Sand Bedding, Concrete Protection, Tiles, Concrete Foundations for Switch-Gear and Motor Centres
Client / Consultant –ADNOC /Fluor Mideast Ltd., Location – Habshan, Year of Completion – 1983,
Construction of Temporary Facilities such as Water Supply, Sewerage System, Power Supply, Site Grading, Foundations for Accommodation Buildings, etc.
Client / Consultant –ADNOC /Snamprogetti, Location – Ruwais, Year of Completion – 1983,
Construction of Permanent Central Beverage Store, 26 m x 40m Main Frame with steel and roofing with composite insulated aluminum profile block wall protection ceiling, finishes, air-conditioning and ventilation system, electrical works, insulated steel works, 2 Nos Cold Store, etc.
Client / Consultant –ADMA-OPCO, Location – Das Island, Year of Completion – 1982,
Dismantle a portion of existing Store and reinstall the same at the other end. Fairface Concrete, Elevated Water Tank plus all domestic Water Distribution System to the Compound
Client / Consultant –ADMA-OPCO, Location – Das Island, Year of Completion – 1982,
Fairface Concrete, Elevated Water Tank plus all domestic Water Distribution System to the Compound
Client / Consultant – ADNOC, Location – Abu Dhabi, Year of Completion – 1980,
Construction of Canteen Building, Operation Buildings, Sub-station, Fire Station, Product Loading Pump House, Product Loading Gantries, Fire Water and Raw Water Pump House, Vehicle Fueling Station, Sampling Shed, Waste Water Treatment Facilities, Underground Oily Waste Drainage System, Vehicle Wash System, Roads and Pavements, Reinforced Concrete Storage Tanks, Concrete Cable Trenches, Concrete Sleepers and Pipe Supports, Air-conditioning Works, Pipe Crossing Bridges, Equipment Foundations, Open Car Parking Shed, Fencing, Boundary Wall, Micro grading, Supply and Installation of Pole Barriers, Supply and Installation of Overhead Gantry Crane, Carbon steel Pipe Works, Electrical Works, Fire Alarm System, etc.
Client / Consultant –ADNOC /Engineers India Ltd., Location – Al Ain, Year of Completion – 1982,
Site Preparation, Steel Shed Workshop, Class Rooms, Training Administration and Workshop Building in R.C plus all Ancillary External Works
Client / Consultant – ADNOC /Amecs, Location – Abu Dhabi, Year of Completion – 1980,