Seweage and Drainage

Since its establishment in 1975, Astraco has successfully delivered hundreds of projects across a wide range of sectors. Our portfolio includes major infrastructure works, such as potable water networks, sewerage systems, and stormwater networks, as well as industrial facilities, commercial buildings, hotels, and residential developments.

List of Projects

Our major prestigious completed projects in this industry is shown below

Western Region Development Program - Site Grading & Infrastructure Works Contract No. G100

Infrastructure works including Earthworks involving 3,542,180 m3, Road Works involving 242,880 m2 of asphaltic concrete, Potable Water Network involving 26,610 m length of HDPE pipe dia ranging from 160mm to 3l5mm, Sewer Network involving 32,7fii0m length of uPVC pipe with dia 150mm -250mm, Irrigation Network involving 24,150m length of HDPE 110 -280mm OD, Electrical Power Distribution Systems, Pumping stations, and all associated work’s etc.

Client / Consultant –Urban Development Committee / Parsons International Ltd., Location – AI Ain Abu Dhabi, Year of Completion – 2010,

Sewerage Network for Al Bahya Area - Phase 4 Contract No. 507/9

Supply, Construction and Commissioning of Approx. 12.4 KM UPVC Gravity Sewers of 150 mm and 200 mm Dia, Approx. 6.35 KM GRP Gravity Sewers of 300, 350 and 400mm Dia, Approx. 4.75 KM of 300 mm Dia Pumping Main and associated valve chambers, manholes, property chambers, etc.

Client / Consultant – SPC /Carsons International Ltd, Location – Taweelah Abu Dhabi, Year of Completion – 2003,

Irrigation Pipeline from Al Salam Street to Mina Zayed Road Contract No. 185/3C (1 )

Supply and Construction of Irrigation Pumping Main, 450mm Dia UPVC, Approx. 1.8 KM and 1.0 KM Subsidiary Line, 225mm Dia UPVC, 2.0 to 4.5m deep, all associated works, 25 Nos ValveChambers, NDRC, etc.

Client / Consultant – SPC /Hyder Consulting, Location –  Abu Dhabi, Year of Completion – 2002,

Sewerage and Surface Water Drainage of Sector EB2/01 Contract No. 215/B

Supply and Construction for Sewerage and Storm Water Pipeline with 150 to l600mm UPVC/GRP/Concrete Pipe, 1.0 m to 12.0 m deep (Total 36.0 KM), including 1070 Nos Manholes/Inspection Chambers, 2 Nos Pumping Station and all associated works.

Client / Consultant –SPc /Acer/John Taylor & Sons, Location –  Bani Yas, Year of Completion – 1999,

Internal Roads for Low Cost House along Sila Road & Mirfa road at AI Mirfa - Sewerage Works Contract No. 216/95

Supply and construction of Sewerage Pipeline

with 150 to 500mrr\ Dia GRP Pipe, 10nJ to 7.0 m deep, (Total 18.0 KM) including 15G Nos Manholes, associated works, Sewage Treatment Plant including all associated electro mechanical works.

Client / Consultant – PW D /ltal Consult, Location – Al Mirfa, Year of Completion – 1998,

Main Pumping Station MPS 13, Lifting Station and Pressure Pipelines at Khalifa Town "A" Contract No. 414A

Supply and Construction of Sewerage Pipeline with 150 to 1000 mm Dia GRP Pipe and 1400 to 2400 mm Dia Concrete Pipes, 1.5 m to 10.5 m depth (total 24.4. K.M) including 12 manholes, 1 No. Pumping Station, S Nos Lifting Station, 3 Nos Sea Outfall Lines, 1600 meters NDRC, etc.

Client / Consultant – SPC /Dorsch Consult, Location – Khalifa Town A Abu Dhabi, Year of Completion – 1997,

AI Ain Main Drainage Suweihan Area Contract No. M24E

Construction of Sewerage and Storm Water

Network G9.0 KM of GRP/VC F’ipelines, 150 to 900 mm dia, 2 Nos Pumping Stations, Sewage Treatment Works and all associated electro mechanical works at Suweihan I AI Ain Area

Client / Consultant – AI Ain Sanitary DrainageCommittee /D.Balfour & Sons, Location – Suweihan Al Ain, Year of Completion – 1996,

Main Drainage for Shuwaiba Area Contract No. M23A

Construction of Sewerage System at Shuwaiba Area including Sewage Network, Storm Water Network, House Connections (Total 67.0 KM of 150 to 900 mm Dia GRP/VC Pipes), 1 No. Pumping Station, 4.5 KM of Concrete Culvert, Electro Mechanical Works, 325,000 m2 Roads and associated works, street lighting.

Client / Consultant – AI Ain Sanitary Drainage Committee /D.Balfour & Sons, Location –  Al Ain, Year of Completion – 1996,

Al Khazna Area Drainage Contract No. M19C & M19D

Construction of Sewerage System at Al Khazna including Sewage Network, Storm Water Network, House Connections, 3 Nos Pumping Stations including complete electro mechanical works, Sewerage Treatment Works consisting Aeration tank, Secondary Tank, effluent Storage Tanks, Accommodation Blocks, Garage/Office Building, Chlorine Building, Generator House, Municipal Branch Office Building, external works such as boundary wall, 15,000 m3 asphalt road works, area lighting.

Client / Consultant –AASDC /D.Balfour & Sons, Location – AI Khazna, Year of Completion – 1993,

House Connections & Gravity Sewer for Baniyas - EB11 Contract No. 403/3

Supply and construction of Sewerage 7.2 KM Sewerage Pipeline with 150 mm – 400mm DİD GRP Pipe, 1.5 to 9.0 m deep, total 7,200 meters including 162 Manholes and associated work’s.

Client / Consultant – SPC IDorsch Consult, Location – Al Nahda Abu Dhabi, Year of Completion – 1991,

House Connections & Gravity Sewer for AI Nahda Contract No. 401/1

Supply and construction of Sewerage 16.2 KM Sewerage Pipeline with 150 mm – 400mm Dia GRP Pipe, 15. To 8.0 m deep, including 32ß Manholes and associated works.

Client / Consultant – SPC /Dorsch Consult, Location – Al Nahda Abu Dhabi, Year of Completion – 1991,

House Connections & Gravity Sewer for AI Nahda Contract No. 401/2

Supply and construction of Sewerage 7.2 KM Sewerage Pipeline with 150 mm – 400mm DİD GRP Pipe, 1.5 to 9.0 m deep, total 7,200 meters including 162 Manholes and associated work’s.

Client / Consultant – SPG /Dorscin Consult, Location – Al Nahda Abu Dhabi, Year of Completion – 1991,

Abu Dhabi Sewerage Scheme Musafah Connections-Phase 5 Contract No. 147/5

Construction of 6.0 KM pressure main, 8.0 KM of gravity sewers, manholes, 2 Nos pumping stations including all electro mechanical work’s.

Client / Consultant – SPC /Jon Taylor & Sons, Location -Musafah Abu Dhabi, Year of Completion – 1990,

Abu Dhabi Sewerage Scheme Contract No. 158

Supply and construction of 15.6 KM Sewerage Pipeline with 150 mm – 300mm Dia GRP and VC pipes, 1.5 to 10.0 m deep including 260 manholes, 55 Nos collection chambers, 2 Nos NDRC, asphalt reinstatement, earth works, etc.

Client / Consultant – SPC /Jon Tavior 6 Sons, Location – Bani Yas Abu Dhabi, Year of Completion – 1966,

Abu Dhabi Sewerage Scheme Contract No. 144/2

Supply and construction of 3.0 KM sewerage Pipeline with 150 – 20Omm Dia GDP and VC P pipes, 1.5 m to 10.0 m deep including 36 manholes, 11 collection chambers, 12 inspection chambers, 3 Nos NDRC, temporary pumping main, pump room, with all electro mechanical works, asphalt reinstatement, earth works, etc.

Client / Consultant – SPC /Jon Tavior 6 Sons, Location – Abu Dhabi, Year of Completion – 1985,